Development of Preliminary Safety Analysis Report on Chornobyl NPP Level 1 at The Final Stage of Closure and Safe Storage
Period: 2005-2006 Customer: British Nuclear Group (BNG), Department of Trade and Industry (DTI), UK The objective of the Preliminary Safety Analysis Report (PSAR) is to ensure that the level of...