Chornobyl Center for Nuclear Safety, Radioactive Waste and Radioecology

 Search  

Nuclear and Radiation Safety
We provide the following services in the area of nuclear and radiation safety: alt
  • safety analysis of nuclear facilities:
    • thermal and hydraulic calculations, modeling of emergencies at nuclear facilities;
    • NPP safety analysis, radiological risks assessment;
    • development of specific software and electronic training programs;
    • nuclear and physical calculations;
  • development of documentation on decommissioning;
  • development of organizational documentation, performance of comprehensive engineering and radiation surveys of nuclear power units;
  • qualification upgrade services in the area of emergency preparedness and response, environmental protection of NPP controlled area;
  • analysis of thermal conditions for spent nuclear fuel storage;
  • radioactive waste management and their characterization.
 
 
Major projects of the Chornobyl Center in the area of nuclear and radiation safety:
  • Decommissioning and Decontamination of Chornobyl NPP Units 1&2;
  • Study of Chornobyl NPP Unit 2 GRP-2-125 Graphite Radioactivity;
  • Basic Safety Research of The Nuclear Facility, Decontamination of Concrete Surfaces in The Shelter Object’s Premises;
  • Basic Research of The Activities to Recover The Damaged Facility and Its Environment: Reducing Activity of Fuel Containing Material (FCM) and Other Radioactively Contaminated Material at The Shelter Object by Way of Transmutation;
  • Development of The Method to Calculate Activity of The South Ukrainian NPP (SUNPP) Waste;
  • Development of The NNEGC Energoatom's Enterprise Standard (ES) “Decommissioning of an NPP Unit. Information Support System (ISS). Structure, Procedure of Information Collection, Processing and Storage”;
  • Limited Probabilistic Safety Analysis (PSA) of Khmelnitskiy NPP (KhNPP) Unit 1, Level 1 (Part 1);
  • Draft Detailed Safety Analysis of Khmelnitskiy NPP (KhNPP) Unit 1. Probabilistic Safety Analysis (PSA) for Internal Initiators (Part 2);
  • Analysis of Thermal Storage Conditions for The Chornobyl NPP Spent Fuel Under Conditions of Its Long-Term Interim Storage at ISF-2;
  • Shelter Object Safety Analysis;
  • Probabilistic Safety Analysis of Extreme External Effects for Zaporizhzhia NPP (ZNPP) Unit 5;
  • Training Course on Emergency Preparedness and Response for The Experts of Ukrainian NPPs and NNEGC "Energoatom";
  • Arrangement and Delivery of The Training Course in Emergency Response (Lessons Learned From the Chornobyl Accident) to The U.S. California National Guard;
  • Development of Radiation Protection Program (RPP) for The Shelter Object (SO);
  • Development of Radiation Protection Program (RPP) for the Chornobyl NPP at the Final Stage of Closure.

Contacts:
Head of The Decommissioning Department
Vasyl R. Rylov
Tel.: +38(04579) 2 27 48
Fax: +38 (04579) 2 81 44
vrylov@chornobyl.net

  © 2006 Chornobyl Center